Pushing forward on a number of fronts we see interior framing moving ahead, new steps off the back deck, and plumbing moving down toward the ground. |
|
|
|
|
|
The new bedroom and
bath in the attic are almost framed up and waste water plumbing begun. |
A pocket door will save space in the master bedroom closet. |
The tedious process
of redoing the chair rail from original wood preserved for that |
|
|
|
|
|
The stringers for the new back stairs are carefully laid out and cut. |
The crew lays them up against the back deck. |
Friday, the 9th, finds them partially built ready for the new work week and completion. |
|
|
|
|
|
Inside some of the firing strips which held the ceiling in the living room are uneven. This is a problem to correct before proceeding. |
The waste water system is nearing the ground. |
The roof is now complete, capped and flashed. |