June 14th , 2008  update

 

This week work continued on preparation for the exterior painting.
That included putting siding on the new dormers.  Inside several
toilets were plumbed, hardware was installed on cabinet doors,
and the kitchen sink was made functional.

With the new brick stairs carefully covered
a first coat of paint is sprayed on the
first floor exterior front. Preparation continued upstairs and around the
sides and back of the house.

With temperatures  in the high 90's our crew
labored to put the siding on the dormers in
preparation for exterior painting. Our
fresh new aluminum roofing reflected
 the heat beautifully.

The exterior shutters came in for attention
this week as well.

By Thursday all but one toilet had been
installed. Much of the cabinet hardware was
in place. And interior plumbing was
moving ahead nicely.

That included the new kitchen sink.

With all of its attendant plumbing.

May 10

May 16

May 22

May 31 June 5

June 7

June 14

June 20

July 10

July 19

July 24

August 1

August 15

August 22

August 29

September 5

September 14

September 21

September 27

October 3

October 25

November 1

November 10

November 16

November 21

November 30

December 7

December 15

December 28

 Jan. 4

Jan. 11

Jan. 18

Jan. 26

Feb. 1

Feb. 10

Feb. 15

Feb. 29

March 7

March 14

March 29

April 4

April 11

April 18

April 25

May 3, 2008

May 9, 2008

May 16, 2008

May 24, 2008

May 31, 2008

June 6, 2008

June 14, 2008

JJune 21, 2008

June 28, 2008

July 4, 2008

July 11, 2008

July 19, 2008

July 25, 2008

August 2, 2008

August 9, 2008

August 16, 2008

 

 

 

Home

The Manse

Manse History

Renovation Plans

Fund Raising Needs

How to Donate

Volunteers in Action

Presbyterian Church on Edisto Is.

Church Mission

Sanctuary Renovation

To read memories from Dr. Charles Spencer of  "An Idyllic Childhood in the Old Manse"
 Click Here

To read memories from Dr. Charles Spencer of  "How the Manse Survived Three Fires"
Click Here