July 6th update

Steady progress continues on the new
addition, porch extension, and deck.

By June 28 the porch and deck had
flooring.  It was ripped into narrow
widths to blend with the architecture
of the Manse.
 

The porch extension required creating
new posts to closely match the existing
ones.  They were made from treated 2x6's.
See them installed immediately below.

Additional access to the porch
extension was provided by
cutting a new door from the
living room.

Looking from the new addition toward the
existing porch you see the space gained by
the addition. You also see how the roof turns
the corner.  (Taken July 6th.)

Looking the other way you
can see the new posts
holding up the roof.

Matching everything perfectly takes time and
patience. 

May 10

May 16

May 22

June 7

June 14

June 20

July 6

July 10

July 19

July 24

August 1

   

 

 

Return to Previous Page

Return to Construction Update

Next Page

Home

The Manse

Manse History

Renovation Plans

Fund Raising Needs

How to Donate

Volunteers in Action

Presbyterian Church on Edisto Is.

Church Mission

Sanctuary Renovation